I have a lot of turnouts

 Uncategorized  Comments Off on I have a lot of turnouts
Dec 102013
 

to build. I don’t presently have a contract to build any. I do have a home layout that I’ve been dreaming about. But nothing pressing at the moment. Built a turnout last night. Built one today and started on a another. After that half I’ll only have four more right hand turnouts to build and ten left hand S scale code 83 #5s to build.

Irregardless if anyone is interested I have more than ten each left and right HO code 55 standard gauge turnouts that could use a good home. There were intended to populate the layout that I was building before I decided to switch to S scale.

Have tools to build the following turnouts: HO code 55 #5 standard gauge straight turnouts and crossovers, HO code 70 #8 standard gauge straight turnouts and crossovers, HO code 83 #6 & #8 standard gauge straight turnouts and crossovers, S code 83, #5, #6, #8 standard gauge, straight turnouts. Hopefully by April also S code 83 #7 standard gauge straight turnouts and HO code 83 #5 crossovers.

(Some custom tools are much more than I care to pay. I really would like a cnc router and laser etch machine.)