Jul 282012
 

Its beginning to look like a layout.

The legs are held on with clamps for the time being. We are planing to continue building at the shop. Add all the subroadbed, cork, track, wire and make operational. Paint the rail. Prep control panels. Separate the tables so that they can be easily moved. Reassemble in the customer’s train room. More permanently attach the legs. Ballast track on site. Mount control panels. Etc.


Sorry, the comment form is closed at this time.